Asphalt Paving Calculator

Determine hot mix asphalt (HMA) tonnage and material costs for driveways, roadways, and parking areas.

Total area to be paved
2.5 inches
1.5" (Overlay) 2.5" (Standard Drive) 3.5" (Commercial) 5"+ (Heavy Truck)
Standard HMA = 145 lbs/cu ft
Plant FOB or delivered
Hot Mix Asphalt Required
22.7 Tons
45,313 lbs total material
Est. Material Cost $1,930 Asphalt plant cost
Truck Loads 2 Loads Hot mix insulated trucks
Compaction Rule of Thumb Loose hot mix uncompacted screed depth compacts by approximately 25% under a steel drum vibratory roller. Laying 3 inches loose achieves ~2.25 to 2.5 inches compacted.

Recommended Tools & Equipment

Tested hardware and components for high reliability

100% Free Tool Zero Sign-Up

How Asphalt Tonnage Is Calculated

Hot Mix Asphalt (HMA) density averages 145 to 148 lbs per cubic foot when fully compacted:

Volume (Cubic Feet) = Area (sq ft) × (Compacted Thickness in Inches / 12)
Weight (Pounds) = Volume (cu ft) × 145 lbs/cu ft
Tons = Weight (lbs) / 2,000 lbs

Always add a 5% waste factor to allow for irregularities in the aggregate base course and hand work around edges and curbs.

Frequently Asked Questions

How many square feet does 1 ton of asphalt cover?

At a standard 2-inch compacted depth, 1 ton of asphalt covers approximately 80 to 82 square feet. At 3 inches, it covers roughly 54 square feet.

What temperature must hot mix asphalt be when laid?

Hot mix asphalt arrives on the job site between 275°F and 300°F and must be fully compacted before cooling below 175°F (the cessation temperature).

What is the difference between binder course and wearing course?

Binder course uses larger 3/4" aggregate for structural load bearing. The surface wearing course uses finer 3/8" or 1/2" aggregate for a smooth, waterproof finish.