Gas Reservoir p/z Material Balance & OGIP Calculator
Determine Original Gas In Place ($G$ / OGIP), gas compressibility factor ($Z$), ultimate recovery factor, and remaining reserves at abandonment pressure.
Gas Reservoir Pressures & Production
OGIP & Recoverable Reserves
Original Gas in Place (G / OGIP)
-
-
Total Recoverable Reserves (EUR)
-
-
Initial (p/Z)_i
--
Current (p/Z)
--
Remaining Reserves
--
Volumetric Depletion Linearity
p/Z = (pi / Zi) · (1 - Gp / G) | Straight-line decline confirms closed volumetric tank.
Recommended Tools & Equipment
Tested hardware and components for high reliability
100% Free Tool
Zero Sign-Up