HRSG Pinch Point & Approach Temperature Calculator

Determine evaporator pinch temperature difference, economizer approach margin, high-pressure steam generation, and boiler exhaust stack temperature.

Gas Turbine Exhaust & Steam Cycle

Standard economic 8°C - 12°C
Margin below boiling in eco (5-8°C)

HRSG Heat Transfer & Steam Generation

HP Steam Production Rate:
Drum Saturation Temp (T_sat):
Gas Temp at Pinch Point (T_gp):
Economizer Water Outlet Temp:
HRSG Stack Exhaust Temp:
Thermal Heat Recovered:

Recommended Tools & Equipment

Tested hardware and components for high reliability

100% Free Tool Zero Sign-Up

HRSG Temperature Profile & Pinch Point

In a Heat Recovery Steam Generator (HRSG), the hot exhaust gas from a combustion turbine transfers heat successively to superheaters, evaporators, and economizers. Because boiling occurs at a constant saturation temperature ($T_{sat}$), the temperature difference between the exhaust gas and steam reaches a minimum bottleneck at the evaporator outlet, known as the pinch point.

Economizer Approach Temperature

To prevent premature steaming inside economizer tube bundles (which can cause water hammer, thermal shock, and severe vibration), the water exit temperature is kept $5^\circ\text{C}$ to $10^\circ\text{C}$ below the drum saturation temperature. This safety temperature delta is the approach temperature ($\Delta T_{app} = T_{sat} - T_{eco,out}$).